Entreprise du Bâtiment MS SA logo, medical practice renovation in GenevaMedical practicesEntreprise du Bâtiment MS SA
Wall-hung washbasin on white wall tiles and anthracite floor

Sanitary facilities and water points

Medical practice sanitary facilities and water points in Geneva with our partners

Your medical practice fit-out company

Once the permit is granted, a single point of contact coordinates all the trades.
With a hand basin in each room, toilets for patients and a cleaning room, water points structure a practice as much as its partitions.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA coordinates the creation and renovation of the sanitary facilities and water points of practices and medical centres in Geneva, carried out by its partner companies. They include the hand basins in consultation and treatment rooms, toilets for patients and staff, showers when the activity requires them, kitchenettes and connections to the building’s risers, fitted by our partners, as well as wall tiles and tiled floors.

Water points in the rooms

The hand basin in a consultation or treatment room is placed as close as possible to the water and drain risers. When the distance is large, the route runs through a partition, a suspended ceiling or a plinth, with the necessary drainage falls.

The fittings are chosen for frequent cleaning, with a wall-hung basin, elbow or wrist-operated taps if you wish and wall tiles or a washable splashback panel.

Patient and staff toilets

Toilets for patients are sized to be accessible when the layout of the premises allows it. This concerns the door width, the turning space, the grab bars and the clear washbasin. Staff toilets can be more compact.

Wall-hung toilets fitted by our partners, tiled floors with skirting, wall tiles to a sufficient height and air extraction connected to the relevant package are carried out according to the specifications you or your architect give us.

Showers, kitchenettes and cleaning rooms

A physiotherapy space or a centre with a changing room may need a walk-in shower. Staff rooms receive a made-to-measure kitchenette. A cleaning room with a slop sink makes daily cleaning easier.

These secondary water points are planned from the partition plan stage, because they depend on the same risers and the same drainage falls.

From water points to complete renovation

Adding or moving a water point often affects the partitions, floors and coverings around it. Entreprise du Bâtiment MS SA can include this work in a complete renovation of the practice and coordinate the partner plumbing installer with the other trades. You keep a single contact once the permit is granted and until the fittings are commissioned.

How it runs

The existing risers and drains are located at the visit and the fittings layout plan is approved with you before the quote. On the worksite, our partner companies carry out chases or routes in partitions, supplies and drains, installation of fittings and taps, then tests, and we the waterproofing of wet areas and the floor and wall tiling.

The necessary water shut-offs are announced in advance and grouped together, in agreement with the property management agency if they concern other premises in the building.

Specifying the water points before the quote for your practice in Geneva

To price the water points of a practice in Geneva, prepare a list fitting by fitting. A consultation hand basin, a kitchenette and a piece of medical equipment do not necessarily have the same needs. The list should state the expected use and the data already available, rather than assume a connection solution.

One sheet per location

  • The use specifies the room concerned, the users and the planned fitting, with its data sheet if a model has been chosen.
  • The location states the desired position and the current position, with the known supplies, drains and access points.
  • The existing items kept lists the fittings, risers, coverings and furniture to protect.
  • The associated work covers openings, substrate repairs, waterproofing, finishes and any power supplies from another package.

Identifying responsibilities at the interfaces

The quote should state where the plumbing package starts and ends, whether it is the private connection, any work on a shared riser, the supply of fittings or the installation and connection of equipment supplied by a third party. A change to the common parts is prepared with the owner or the property management agency. The shut-off and access conditions are to be confirmed before the work.

The SIG documents for water installations include notices of work and specifications relating to water. The qualified installer confirms the procedures and requirements that apply to the installation concerned. Needs linked to medical activity, hygiene and accessibility are to be validated in the file. They cannot be deduced from a photograph of the premises.

Planning the end-of-work checks

Ask which tests, adjustments, instructions and markings are included, as well as the conditions for putting the water points back into use. If a network capacity or a route remains uncertain, this point should be flagged in the quote with the necessary check, without announcing that feasibility is settled.

Describe the practice and the fittings concerned in your request. Prepare the plans and data sheets for the next discussion, removing any information relating to patients.

Sanitary facilities and water points municipality by municipality

Water points in Aire-la-Ville Water points in Anières Water points in Avully Water points in Avusy Water points in Bardonnex Water points in Bellevue Water points in Bernex Water points in Carouge Water points in Cartigny Water points in Chancy Water points in Choulex Water points in Chêne-Bougeries Water points in Chêne-Bourg Water points in Collex-Bossy Water points in Collonge-Bellerive Water points in Cologny Water points in Confignon Water points in Corsier Water points in Céligny Water points in Dardagny Water points in Genthod Water points in Geneva Water points in Gy Water points in Hermance Water points in Jussy Water points in Laconnex Water points in Lancy Water points in Le Grand-Saconnex Water points in Meinier Water points in Meyrin Water points in Onex Water points in Perly-Certoux Water points in Plan-les-Ouates Water points in Pregny-Chambésy Water points in Presinge Water points in Puplinge Water points in Russin Water points in Satigny Water points in Soral Water points in Thônex Water points in Troinex Water points in Vandœuvres Water points in Vernier Water points in Versoix Water points in Veyrier

Describe this project in Geneva

What the quote includes

Supplies and drains from the risers, fittings and taps specified by model or range by our partner companies, waterproofing, floor and wall tiling, joints, fixed accessories, commissioning and waste removal.

Work on the building’s shared risers and changes to ventilation are priced separately when they turn out to be necessary.

Finishes carried out

Sanitary room with wall-hung toilet and walk-in shower
Tiled walk-in shower with water supplies ready for connection
Double washbasin top with backlit mirrors
Made-to-measure wooden kitchenette with white worktop

Frequently asked questions

What practitioners ask us

Can a water point be created far from the risers?

Often, yes, provided there is a sufficient drainage fall or a lifting pump. We measure the distances and heights during the visit and state the solution chosen in the quote.

Do patient toilets have to be accessible to people with reduced mobility?

The requirements depend on your activity, the building and the applicable specifications, which you or your architect pass on to us. Our partner companies build the sanitary facilities according to these instructions, and we point out at the visit what the layout of the premises allows.

Which materials for the wet areas of a practice?

Floor and wall tiles remain the reference for floors and walls exposed to water, with joints that withstand cleaning products. Washable panels can replace wall tiles as a hand basin splashback. The choice is made with you room by room.

Does plumbing work cut off the practice’s water for long?

Connections to the risers require short shut-offs, announced in advance and grouped into the same time slot. The rest of the work is done without interrupting water in the rooms in use.

Your project

A practice is renovated first on plan and in writing.

Describe your premises, the activity that takes place there and the work you have in mind. We call you back to pin down the scope, then we draw up the quote.

Tell us about my project WhatsApp
My project Version française