Practical guide

Prepare your project in Geneva

Your medical practice fit-out company

Once the permit is granted, a single point of contact coordinates all the trades.
A practice worksite is prepared as much in the practice as on the worksite. Here are the points we go over with each practitioner before drawing up a quote.

In brief

Before renovating a medical practice in Geneva, you need to write the room programme and their use, gather the plans and the owner’s agreements, decide whether the practice stays open during the work, list the equipment to install and its requirements, check the permits that are up to the practitioner, then set a timeline with a margin for the unexpected.

Writing the room programme

List each room you want and what happens in it, with the number of consultation rooms, one or more treatment rooms, a reception and its number of workstations, a waiting room and its capacity, patient and staff sanitary facilities, a staff room and storage.

For each room, specify the water points, closed storage and equipment to install. This list becomes the basis of the quote and avoids omissions during the worksite.

Gathering the documents

A plan of the premises, even an old one, the building regulations or the lease, the data sheets of the planned equipment and, if an architect is involved, their plans. These documents make it possible to locate the risers, ducts and building constraints before the visit.

If you rent, ask the owner or the property management agency early what they accept in terms of drilling, changing partitions, work on the risers and worksite hours.

Deciding whether the practice stays open during the work

Closing the practice shortens the worksite and lightens the protection and phasing. Keeping it open requires splitting into zones, temporary partitions, time slots for noisy work and a fallback room for consultations.

The decision affects the schedule and the quote. Make it before the visit, taking your quieter periods into account.

Listing the equipment and its requirements

Each piece of equipment, from the chair to the examination table, the imaging unit, the autoclave or the refrigerated cabinet, has needs in terms of power, drainage, floor load or ventilation. The supplier’s data sheets state these needs.

Send them before the quote. We plan the corresponding openings and reinforcements in the building work, and our partners the power supplies. Installing the equipment remains the supplier’s job.

Checking what is up to you

The permits linked to practising your activity, the change of use of premises, notification to the competent authorities and the requirements specific to your speciality are up to the practitioner or the owner. Check with the relevant departments before setting the timeline.

On our side, we tell you at the visit whether the planned work needs a building permit and which technical documents we can provide for your files.

Setting a realistic timeline

Allow time for the quote, for the owner’s agreements, the delivery times of coverings and made-to-measure joinery, then the duration of the worksite and a margin for the unexpected found when walls and floors are opened up.

Set the desired opening or reopening date from this calculation, and not the other way round. The schedule attached to the quote shows the key dates and the rooms concerned at each phase.

Frequently asked questions

What practitioners ask us

Should several quotes be compared?

It is common practice. To compare usefully, make sure each quote describes the same room programme and the same finishes and specifies what is included, such as protection, phases, cleaning and coordination of the specialist companies.

How long before opening should the request be made?

As early as possible once the premises have been identified. Between the request, the quote, the owner’s agreements, the orders and the worksite, several months can go by for a complete fit-out. A partial renovation is prepared more quickly.

Can the practice stay open during the work?

Yes, with a split into zones, temporary partitions, time slots for noisy work and a fallback room for consultations. Closing the practice does, however, shorten the worksite and lighten the protection and phasing.

Your project

A practice is renovated first on plan and in writing.

Describe your premises, the activity that takes place there and the work you have in mind. Entreprise du Bâtiment MS SA gets back in touch with you to define the scope and prepare the quote.