
Thônex, canton of Geneva
Medical practice sanitary facilities and water points in Thônex with our partners
Your medical practice fit-out company
A hand basin in each room and clean sanitary facilities are expected in any practice. Entreprise du Bâtiment MS SA coordinates its tiler with the partner plumbing installer and electrician in Thônex.
In brief
Entreprise du Bâtiment MS SA creates and renovates the water points of medical practices in Thônex. Hand basins in each consultation and treatment room, toilets for patients and staff, an adapted toilet, a shower for physiotherapy, connections to the building’s risers, wall tiles, ventilation and water heaters are carried out by our teams and our partner companies, which we coordinate.
The context in Thônex
Along the route followed by the tram to the customs post, Thônex combines apartment building districts, villa areas and an old village on the border. A vast recent residential district has taken the place of former farmland, between the Seymaz and the Foron. Worksites in apartment buildings are agreed with property management agencies, and cross-border traffic marks the peak hours.
In the recent district, a practice on the ground floor of a new building is partitioned on a shell floor plate with level access. Along the tram route, deliveries avoid the cross-border peaks and older upper floors require carrying materials up the stairwell.
Adding a hand basin where there is none in Thônex
We check the distance to the water and drain risers and propose the shortest route, exposed or built into a partition or a suspended ceiling.
A lifting pump handles cases without a sufficient fall.
Patient and staff sanitary facilities
Wall-hung toilets, hand basins with touchless taps, hand dryers and washable surfaces make cleaning easier.
A toilet adapted for people with reduced mobility is planned when space allows.
Wall tiles, ventilation and hot water
Wall tiles up to splash height, watertight joints, air extraction and hot water production sized to the number of water points.
The work is done room by room to keep consultations going.
The items in a water points quote in Thônex, with our partners
- Survey of the risers and routing of the services
- Supplies, drains and lifting pump if needed
- Hand basins, toilets and taps
- Wall tiles and joints
- Ventilation and water heater
- Finishes and tests
Once the permit is granted, a single point of contact for all the trades
Plumbing installer, tiler, electrician, plasterer and painter work around the water points. Entreprise du Bâtiment MS SA engages and manages these trades and organises the water shut-offs with the property management agency.
How a request runs in Thônex
We draw up a detailed quote after talking about your project and visiting the premises. Whether you have an individual practice or a medical centre, the approach stays the same. When the practice has to stay open, the phasing is settled before the quote.
A manager remains reachable during the worksite and we hand over each room with you before it is put back into use.
Sanitary facilities and water points in the canton All the work in Thônex Partitions and ceilings in Thônex Floors and walls in Thônex Dental practice in Thônex Physiotherapy in Thônex Reception and waiting in Thônex Consultation room in Thônex Water points in Lancy Water points in Onex Water points in Perly-Certoux All municipalities
How we work in Thônex
Each consulting room needs a well-placed water point. Our partner installer locates the existing risers, lays the supplies and drains inside the partitions, then fits the washbasins, with hands-off taps when the practitioner wishes.
A pressure test is carried out before the partitions are closed.
Planning a project in Thônex? Entreprise du Bâtiment MS SA, a construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.
Frequently asked questions
Your questions in Thônex
Can a hand basin be added to a room without a water supply in Thônex?
In most cases, yes, depending on the distance to the building’s risers. We check this during the visit.
How long does it take to create a water point in Thônex?
Two to four days per water point including wall tiles and finishes. A schedule accompanies the quote and follows your consultation hours and closures.
Is the property management agency’s agreement needed to touch the risers in Thônex?
Yes, for any connection to the building’s risers. We prepare the technical elements of the request.
Can the practice stay open during this work in Thônex?
Yes, room by room, with a short water shut-off announced in advance.
Your project
Water points to create in Thônex?
Describe the rooms concerned and what is currently in place. Entreprise du Bâtiment MS SA gets back in touch with you to define the scope and price each item.
