Defining the rooms and the privacy needs
Identify the consultation spaces, circulation areas and service rooms according to the operator’s programme. State the equipment to be fixed, the openings and the uses on either side of the walls.
A privacy need must be translated into requirements to be studied by the professionals concerned. A new partition does not by itself prove acoustic performance. Doors, technical passages and junctions contribute to the result and must be examined together.
Coordinating the ceiling with the services
Have the heights and existing equipment surveyed before choosing a ceiling. Locate the penetrations, control devices and elements that will need to remain accessible. The design must reconcile the finished work with future maintenance.
Specify who provides the dimensions and needs of the appliances. A hatch or technical passage planned late can mean redoing a finish. A validation point before closing allows these interfaces to be dealt with at the right time.
| Item | Useful information | Check before closing |
|---|---|---|
| Appliance | Location and supplier’s data sheet | Opening and interface approved |
| Maintenance device | Access needed during operation | Position and dimensions of the chosen access |
| Penetration | Service and party concerned | Junction dealt with in the defined solution |
| Door or partition | Finished height and planned junction | Consistency of the plans of the different packages |
Giving doors their place in the file
Dimensions, opening direction, frames and door hardware must be coordinated with the partitions and floors. Have the works kept and the junctions to redo identified rather than treating each package as independent.
The solution must be approved according to the requirements that actually apply to the project. When the file requires it, the regulatory duties are carried out by the architect or the professionally qualified representative (MPQ) authorised for the work. Organising the work does not count as official approval of the practice.
Preparing the phasing and procedures in Thônex
State whether the practice will be closed and which zones will need to remain accessible. Identify the shut-offs, deliveries and operations that create constraints for the activity. The site management confirms the slots actually available before the schedule is committed.
For an outdoor footprint, the forms desk of Thônex helps identify the request suited to the work or to public occupation. This procedure remains separate from approvals concerning interior alterations and the medical activity.
Comparing a complete and verifiable scope
In the quotes, identify the partitions, linings, ceilings, doors, openings and finishes. Ask for the limits with the other parties and how changes after approval are handled.
The handover is organised on the basis of the chosen plans and the planned checks on locations, technical access, junctions, documents and reservations. To start, prepare the plan, the use of the rooms, the equipment and the activity constraints of your address in Thônex.
Prepare your request and the project documents