
Onex, canton of Geneva
Medical practice sanitary facilities and water points in Onex with our partners
Your medical practice fit-out company
A hand basin in each room and clean sanitary facilities are expected in any practice. Entreprise du Bâtiment MS SA coordinates its tiler with the partner plumbing installer and electrician in Onex.
In brief
Entreprise du Bâtiment MS SA creates and renovates the water points of medical practices in Onex. Hand basins in each consultation and treatment room, toilets for patients and staff, an adapted toilet, a shower for physiotherapy, connections to the building’s risers, wall tiles, ventilation and water heaters are carried out by our teams and our partner companies, which we coordinate.
The context in Onex
A housing estate of tower blocks standing on the plateau above the Rhône sets the tone in Onex, in contrast with the old village and the villa districts. Riverbanks and large parks bring nature to the foot of the homes. Property management agencies and tenants are involved in work in apartment buildings, while villas call for more personal renovations.
In a high-rise building, fitting out a practice depends on booking the lift to bring up partitions and furniture and on protecting the halls. Drilling hours are agreed with the property management agency to spare tenants on the upper floors.
Adding a hand basin where there is none in Onex
We check the distance to the water and drain risers and propose the shortest route, exposed or built into a partition or a suspended ceiling.
A lifting pump handles cases without a sufficient fall.
Patient and staff sanitary facilities
Wall-hung toilets, hand basins with touchless taps, hand dryers and washable surfaces make cleaning easier.
A toilet adapted for people with reduced mobility is planned when space allows.
Wall tiles, ventilation and hot water
Wall tiles up to splash height, watertight joints, air extraction and hot water production sized to the number of water points.
The work is done room by room to keep consultations going.
The items in a water points quote in Onex, with our partners
- Survey of the risers and routing of the services
- Supplies, drains and lifting pump if needed
- Hand basins, toilets and taps
- Wall tiles and joints
- Ventilation and water heater
- Finishes and tests
Once the permit is granted, a single point of contact for all the trades
Plumbing installer, tiler, electrician, plasterer and painter work around the water points. Entreprise du Bâtiment MS SA engages and manages these trades and organises the water shut-offs with the property management agency.
How a request runs in Onex
You describe your premises, your activity and the planned work using the form or by phone. After we call you back, a visit is arranged if the project calls for it and we survey the premises.
The quote details each room and each item and presents the options separately. After your written agreement, we settle the schedule and any phases together, in liaison with the building’s property management agency if needed.
Sanitary facilities and water points in the canton All the work in Onex Accessibility in Onex Joinery in Onex Practice that stays open in Onex New practice in Onex Veterinary practice in Onex Compliance in Onex Water points in Thônex Water points in Troinex Water points in Vandœuvres All municipalities
How we work in Onex
Each consulting room needs a well-placed water point. Our partner installer locates the existing risers, lays the supplies and drains inside the partitions, then fits the washbasins, with hands-off taps when the practitioner wishes.
A pressure test is carried out before the partitions are closed.
Planning a project in Onex? Entreprise du Bâtiment MS SA, a building company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.
Frequently asked questions
Your questions in Onex
Can a hand basin be added to a room without a water supply in Onex?
In most cases, yes, depending on the distance to the building’s risers. We check this during the visit.
How long does it take to create a water point in Onex?
Two to four days per water point including wall tiles and finishes. A schedule accompanies the quote and follows your consultation hours and closures.
Is the property management agency’s agreement needed to touch the risers in Onex?
Yes, for any connection to the building’s risers. We prepare the technical elements of the request.
Can the practice stay open during this work in Onex?
Yes, room by room, with a short water shut-off announced in advance.
Your project
Water points to create in Onex?
Describe the rooms concerned and what is currently in place. Entreprise du Bâtiment MS SA gets back in touch with you to define the scope and price each item.
