Entreprise du Bâtiment MS SA logo, medical practice renovation in GenevaMedical practicesEntreprise du Bâtiment MS SA
Glazed work space with reception desk

Veyrier, canton of Geneva

Work in a medical practice that stays open in Veyrier

Your medical practice fit-out company

Closing a practice for several weeks is not always possible. Entreprise du Bâtiment MS SA organises the work in Veyrier in phases, around consultations.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA carries out work in medical practices that stay open in Veyrier. Room-by-room phasing, a sealed separation between the worksite and the rooms in use, noisy work scheduled outside consultations, protection of circulation areas, daily cleaning and putting each room back into use are organised with the trades we engage and manage.

The context in Veyrier

Veyrier lies at the foot of the Salève, between the Arve and the border, not far from the starting point of the cable car that climbs the mountain. Detached houses account for most worksites in this sought-after residential setting.

In vast villa districts, fitting out a consultation room on the ground floor of a house means creating an entrance without steps from the street, adapted sanitary facilities and a separation from the home, with hours compatible with a residential neighbourhood.

Phasing decided before the quote in Veyrier

We define with you the rooms to handle in each phase, the possible hours and the rooms that stay in use.

The quote states the duration and scope of each phase.

Separating the worksite from patients

A sealed separation encloses the work zone, circulation areas are protected and dust is extracted at source.

Noisy work is scheduled early in the morning, in the evening or at weekends.

Back in use every day

At the end of each day, the zone is cleaned and secured. Each finished room is handed over with you before being used again.

A manager can be reached throughout the work.

The items in a quote for work in an open practice in Veyrier

  • Phasing plan and hours
  • Sealed separations and protection
  • Work by room according to the phases
  • Dust extraction and daily cleaning
  • Handover of each room
  • Removal of protection and final cleaning

Once the permit is granted, a single point of contact for all the trades

Each trade works within the planned time window, without crossing paths with patients. Entreprise du Bâtiment MS SA engages and manages these companies and keeps the phase schedule with you.

How a request runs in Veyrier

You describe your premises, your activity and the planned work using the form or by phone. After we call you back, a visit is arranged if the project calls for it and we survey the premises.

The quote details each room and each item and presents the options separately. After your written agreement, we settle the schedule and any phases together, in liaison with the building’s property management agency if needed.

Work in a practice that stays open in the canton All the work in Veyrier Medical practice in Veyrier Medical centre in Veyrier Partitions and ceilings in Veyrier Water points in Veyrier Floors and walls in Veyrier Dental practice in Veyrier Practice that stays open in Hermance Practice that stays open in Lancy Practice that stays open in Onex All municipalities

How we work in Veyrier

When the practice continues to see patients, we work in short phases. Each zone is isolated by a dust-tight temporary partition, and noisy work is placed outside consulting hours.

Each evening, the zone is cleaned so that patients are received the next day in clean premises.

Planning a project in Veyrier? Entreprise du Bâtiment MS SA, a construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.

Frequently asked questions

Your questions in Veyrier

Can consultations continue during the work in Veyrier?

Yes, in the rooms outside the worksite zone, separated by a sealed partition. Noisy work is scheduled outside consultations.

Does phased work take longer in Veyrier?

A little, because each room is handled separately. The schedule provided with the quote shows the duration of each phase.

How do you manage dust and noise in Veyrier?

Sealed separation, extraction at source, shifted hours for noise and cleaning every evening.

Should patients be informed in Veyrier?

A simple notice at reception is generally enough. We give you the dates of the noisy phases.

Your project

Work without closing the practice in Veyrier?

Describe your premises, the rooms concerned and your hours. Entreprise du Bâtiment MS SA gets back to you to propose phasing and draw up a quote by item.

Tell us about my project WhatsApp
My project Version française