
Veyrier, canton of Geneva
Dental practice fit-out in Veyrier
Your medical practice fit-out company
A dental practice needs precise services under each chair. Entreprise du Bâtiment MS SA coordinates the trades in Veyrier based on your supplier’s plans.
In brief
Entreprise du Bâtiment MS SA fits out and renovates dental practices in Veyrier. Treatment rooms with water, drainage, compressed air, suction and electricity under each chair, a plant room for the compressor and suction motor, a sterilisation room, reception, waiting room and sanitary facilities are carried out by our teams and our partner companies, which we coordinate.
The context in Veyrier
Veyrier lies at the foot of the Salève, between the Arve and the border, not far from the starting point of the cable car that climbs the mountain. Detached houses account for most worksites in this sought-after residential setting.
In vast villa districts, fitting out a consultation room on the ground floor of a house means creating an entrance without steps from the street, adapted sanitary facilities and a separation from the home, with hours compatible with a residential neighbourhood.
Services installed according to the chair plans in Veyrier
Each chair manufacturer provides a provisions plan. Our partner companies install the supplies, drains, compressed air, suction and electricity exactly at these positions, in the floor or in a partition.
The amalgam separator and the plant room are planned from the outset.
Sterilisation and hygiene
The sterilisation room separates the dirty circuit from the clean circuit, with washable worktops, a water point, sockets and water for the autoclaves.
Floors and walls receive coverings with no open joints.
Reception, waiting and noise
The compressor and suction unit are placed in an insulated room. Treatment rooms receive insulated partitions.
A practice in operation is converted chair by chair.
The items in a dental practice quote in Veyrier
- Survey and chair provisions plans
- Water, drainage, compressed air and suction services
- Plant room, compressor and amalgam separator
- Sterilisation room and washable worktops
- Electricity, lighting and IT network with our partners
- Partitions, floors, painting, reception and waiting area
Once the permit is granted, a single point of contact for all the trades
Plumbing installer, electrician, plasterer, floor layer, joiner and painter work with your chair supplier. Entreprise du Bâtiment MS SA engages and manages these trades and keeps the schedule until the equipment is installed.
How a request runs in Veyrier
You describe your premises, the activity carried out and the work you have in mind using the form or by phone. We get back to you, arrange a visit if the project calls for it and survey the premises.
The quote is drawn up room by room and item by item with the options listed separately. After your written agreement, the schedule and any phases are set with you and, if necessary, with the building’s property management agency.
Dental practices in the canton All the work in Veyrier Electricity in Veyrier with our partners Ventilation in Veyrier Painting in Veyrier Acoustics in Veyrier Accessibility in Veyrier Joinery in Veyrier Dental practice in Hermance Dental practice in Lancy Dental practice in Onex All municipalities
How we work in Veyrier
A dental practice needs specific services at each chair. With our partners, we lay water, compressed air, suction, power and data in the floor or the skirting, following the plan supplied by the equipment installer.
The compressor room is insulated against noise, and the sterilisation room is organised from dirty to clean.
Planning a project in Veyrier? Entreprise du Bâtiment MS SA, a building and construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.
Frequently asked questions
Your questions in Veyrier
What should be planned under a dental chair in Veyrier?
Water, drainage, compressed air, suction, electricity and often the IT network, at the positions specified by the manufacturer.
How long does a dental practice fit-out take in Veyrier?
Six to twelve weeks depending on the number of chairs and the condition of the premises, before the equipment is installed. The quote comes with a schedule set around your consultation hours and closures.
Is a permit needed to fit out a dental practice in Veyrier?
Not for an interior renovation that changes neither the structure, nor the use, nor the layout type of the premises. In that case, neither an architect nor a building permit is needed. If the use or the layout of the premises changes, for example when a partition is moved, or if load-bearing walls are affected, a building permit is required (LCI, Article 1) and we point this out at the visit. The details of the procedure are on the website of the State of Geneva, page apply for a building permit.
Can a chair be added in a practice in operation in Veyrier?
Yes, by enclosing the new room, our partners connecting the services during a short closure.
Your project
A dental practice to fit out in Veyrier?
Describe the premises, the number of chairs and the planned equipment. Entreprise du Bâtiment MS SA gets back to you to clarify the scope and draw up a quote by item.
