Work in a medical practice that stays open in Meinier

Your medical practice fit-out company

Closing a practice for several weeks is not always possible. Entreprise du Bâtiment MS SA organises the work in Meinier in phases, around consultations.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA carries out work in medical practices that stay open in Meinier. Room-by-room phasing, a sealed separation between the worksite and the rooms in use, noisy work scheduled outside consultations, protection of circulation areas, daily cleaning and putting each room back into use are organised with the trades we engage and manage.

The context in Meinier

Farms, old houses and villas mix there, and the remains of a medieval castle stand in a natural zone. Large plots and country access make the work easier, provided the farmland is preserved.

The rural access and large plots allow a van to be parked at the foot of the building. For a practice in a house on the plain, attention focuses on level access for patients and on separating the treatment area from the home.

Phasing decided before the quote in Meinier

We define with you the rooms to handle in each phase, the possible hours and the rooms that stay in use.

The quote states the duration and scope of each phase.

Separating the worksite from patients

A sealed separation encloses the work zone, circulation areas are protected and dust is extracted at source.

Noisy work is scheduled early in the morning, in the evening or at weekends.

Back in use every day

At the end of each day, the zone is cleaned and secured. Each finished room is handed over with you before being used again.

A manager can be reached throughout the work.

The items in a quote for work in an open practice in Meinier

  • Phasing plan and hours
  • Sealed separations and protection
  • Work by room according to the phases
  • Dust extraction and daily cleaning
  • Handover of each room
  • Removal of protection and final cleaning

Once the permit is granted, a single point of contact for all the trades

Each trade works within the planned time window, without crossing paths with patients. Entreprise du Bâtiment MS SA engages and manages these companies and keeps the phase schedule with you.

How a request runs in Meinier

We draw up a detailed quote after talking about your project and visiting the premises. Whether you have an individual practice or a medical centre, the approach stays the same. When the practice has to stay open, the phasing is settled before the quote.

A manager remains reachable during the worksite and we hand over each room with you before it is put back into use.

Work in a practice that stays open in the canton All the work in Meinier Floors and walls in Meinier Dental practice in Meinier Physiotherapy in Meinier Reception and waiting in Meinier Consultation room in Meinier Treatment and sterilisation in Meinier Practice that stays open in Gy Practice that stays open in Jussy Practice that stays open in Laconnex All municipalities

How we work in Meinier

When the practice continues to see patients, we work in short phases. Each zone is isolated by a dust-tight temporary partition, and noisy work is placed outside consulting hours.

Each evening, the zone is cleaned so that patients are received the next day in clean premises.

Planning a project in Meinier? Entreprise du Bâtiment MS SA, a building and construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.

Frequently asked questions

Your questions in Meinier

Can consultations continue during the work in Meinier?

Yes, in the rooms outside the worksite zone, separated by a sealed partition. Noisy work is scheduled outside consultations.

Does phased work take longer in Meinier?

A little, because each room is handled separately. The schedule provided with the quote shows the duration of each phase.

How do you manage dust and noise in Meinier?

Sealed separation, extraction at source, shifted hours for noise and cleaning every evening.

Should patients be informed in Meinier?

A simple notice at reception is generally enough. We give you the dates of the noisy phases.

Your project

Work without closing the practice in Meinier?

Describe your premises, the rooms concerned and your hours. Entreprise du Bâtiment MS SA gets back to you to propose phasing and draw up a quote by item.

Tell us about my project WhatsApp
My project Version française