Entreprise du Bâtiment MS SA logo, medical practice renovation in GenevaMedical practicesEntreprise du Bâtiment MS SA
Consultation office with black partitions

Meinier, canton of Geneva

Medical practice consultation room in Meinier

Your medical practice fit-out company

A consultation room brings together a desk, an examination area and a hand basin in a discreet space. Entreprise du Bâtiment MS SA creates it in Meinier room by room.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA fits out and renovates the consultation rooms of medical practices in Meinier. Hand basins, closed storage, general and examination lighting, sockets and IT network, insulated partitions and door, washable floors and walls, blinds and radiator covers are carried out by our teams and our partner companies, which we coordinate.

The context in Meinier

Farms, old houses and villas mix there, and the remains of a medieval castle stand in a natural zone. Large plots and country access make the work easier, provided the farmland is preserved.

The rural access and large plots allow a van to be parked at the foot of the building. For a practice in a house on the plain, attention focuses on level access for patients and on separating the treatment area from the home.

Desk, examination and hand basin in Meinier

The room is divided into a consultation area and an examination area, with a hand basin reachable from both. Closed storage keeps equipment out of sight.

A curtain or a screen separates the examination table if the room allows it.

Light and privacy

Shadowless general lighting and an examination lamp are planned, with blinds for privacy and heat. Insulated partitions and door keep conversations from being overheard.

Our partner electrician places the sockets according to your devices.

Surfaces and cleaning

Floors with no open joints, washable paints and wall tiles around the hand basin make daily cleaning easier.

Each room is renovated and put back into use separately.

The items in a consultation room quote in Meinier

  • Survey and plan of the room
  • Hand basin, supplies and drain with our partners
  • Partitions, door and sound insulation
  • Lighting, sockets and IT network with our partners
  • Closed storage and casings
  • Floors, washable paint and blinds

Once the permit is granted, a single point of contact for all the trades

Plumbing installer, electrician, plasterer, joiner, floor layer and painter work in the room. Entreprise du Bâtiment MS SA engages and manages these trades and hands over each room in one go.

How a request runs in Meinier

A first discussion and a visit of the premises allow us to draw up a detailed quote. An individual practice and a medical centre follow the same approach. If the practice stays open, we decide on the phases before drawing up the quote.

During the worksite, you can reach a manager and each room is handed over with you before it is put back into use.

Consultation rooms in the canton All the work in Meinier New practice in Meinier Veterinary practice in Meinier Compliance in Meinier Doors and blinds in Meinier Medical practice in Meinier Medical centre in Meinier Consultation room in Gy Consultation room in Jussy Consultation room in Laconnex All municipalities

How we work in Meinier

The consulting room is organised between the desk, the examination couch and the water point. Our partner electrician places the sockets and data points to suit your furniture and fits adjustable lighting, then we fit an acoustic door.

The walls and floor are chosen for simple daily cleaning.

Planning a project in Meinier? Entreprise du Bâtiment MS SA, a construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.

Frequently asked questions

Your questions in Meinier

How long does renovating a consultation room take in Meinier?

Three to six days per room depending on the services and finishes. The quote arrives with a schedule set around your consultation hours and closures.

Can one room be renovated while the others are in use in Meinier?

Yes, the room is closed and sealed off, and the others remain in use.

Is a permit needed to convert a room in Meinier?

Not for an interior renovation that changes neither the structure, nor the use, nor the layout type of the premises. In that case, neither an architect nor a building permit is needed. If the use or the layout of the premises changes, for example when a partition is moved, or if load-bearing walls are affected, a building permit is required (LCI, Article 1) and we point this out at the visit. The details of the procedure are on the website of the State of Geneva, page apply for a building permit.

Which lighting for a consultation room in Meinier?

Even general lighting, an adjustable examination lamp and blinds to control daylight.

Your project

A consultation room to fit out in Meinier?

Describe the room, its use and your equipment. We call you back to pin down the scope of the work, then we draw up a quote by item.

Tell us about my project WhatsApp
My project Version française