Work in a medical practice that stays open in Carouge

Your medical practice fit-out company

Closing a practice for several weeks is not always possible. Entreprise du Bâtiment MS SA organises the work in Carouge in phases, around consultations.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA carries out work in medical practices that stay open in Carouge. Room-by-room phasing, a sealed separation between the worksite and the rooms in use, noisy work scheduled outside consultations, protection of circulation areas, daily cleaning and putting each room back into use are organised with the trades we engage and manage.

The context in Carouge

Next to the urban area in Geneva, on the banks of the Arve, Carouge is a dense town whose old centre, of Sardinian inspiration, lines up low buildings opening onto courtyards and gardens. Facades, windows and roofs in this protected area are strictly regulated, while the outskirts have more recent buildings and former craft areas being converted. Parking and delivering in the town centre call for a tight schedule.

In old Carouge, a practice on an upper floor of a low building is renovated without touching the protected facades or windows. Access through the inner courtyard and the stairwell means protecting the common parts and carrying materials up by hand.

Phasing decided before the quote in Carouge

We define with you the rooms to handle in each phase, the possible hours and the rooms that stay in use.

The quote states the duration and scope of each phase.

Separating the worksite from patients

A sealed separation encloses the work zone, circulation areas are protected and dust is extracted at source.

Noisy work is scheduled early in the morning, in the evening or at weekends.

Back in use every day

At the end of each day, the zone is cleaned and secured. Each finished room is handed over with you before being used again.

A manager can be reached throughout the work.

The items in a quote for work in an open practice in Carouge

  • Phasing plan and hours
  • Sealed separations and protection
  • Work by room according to the phases
  • Dust extraction and daily cleaning
  • Handover of each room
  • Removal of protection and final cleaning

Once the permit is granted, a single point of contact for all the trades

Each trade works within the planned time window, without crossing paths with patients. Entreprise du Bâtiment MS SA engages and manages these companies and keeps the phase schedule with you.

How a request runs in Carouge

After a first discussion about your project and a visit of the premises, we draw up a detailed quote. The approach is the same for an individual practice or a medical centre. If the practice has to stay open, the phased organisation is decided before the quote.

During the worksite, a manager can be reached and each room is handed over with you before it is put back into use.

Work in a practice that stays open in the canton All the work in Carouge Water points in Carouge Floors and walls in Carouge Dental practice in Carouge Physiotherapy in Carouge Reception and waiting in Carouge Consultation room in Carouge Practice that stays open in Troinex Practice that stays open in Vandœuvres Practice that stays open in Veyrier All municipalities

How we work in Carouge

When the practice continues to see patients, we work in short phases. Each zone is isolated by a dust-tight temporary partition, and noisy work is placed outside consulting hours.

Each evening, the zone is cleaned so that patients are received the next day in clean premises.

Planning a project in Carouge? Entreprise du Bâtiment MS SA, a building company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.

Frequently asked questions

Your questions in Carouge

Can consultations continue during the work in Carouge?

Yes, in the rooms outside the worksite zone, separated by a sealed partition. Noisy work is scheduled outside consultations.

Does phased work take longer in Carouge?

A little, because each room is handled separately. The schedule provided with the quote shows the duration of each phase.

How do you manage dust and noise in Carouge?

Sealed separation, extraction at source, shifted hours for noise and cleaning every evening.

Should patients be informed in Carouge?

A simple notice at reception is generally enough. We give you the dates of the noisy phases.

Your project

Work without closing the practice in Carouge?

Describe your premises, the rooms concerned and your hours. Entreprise du Bâtiment MS SA gets back to you to propose phasing and draw up a quote by item.

Tell us about my project WhatsApp
My project Version française