
Céligny, canton of Geneva
Dental practice fit-out in Céligny
Your medical practice fit-out company
A dental practice needs precise services under each chair. Entreprise du Bâtiment MS SA coordinates the trades in Céligny based on your supplier’s plans.
In brief
Entreprise du Bâtiment MS SA fits out and renovates dental practices in Céligny. Treatment rooms with water, drainage, compressed air, suction and electricity under each chair, a plant room for the compressor and suction motor, a sterilisation room, reception, waiting room and sanitary facilities are carried out by our teams and our partner companies, which we coordinate.
The context in Céligny
A Geneva enclave separated from the rest of the canton, Céligny lines the right bank of the lake in a setting that has remained rural. Old houses, villas and vineyard plots sloping down to the water form its village. The distance from Geneva and the care taken of the preserved setting tilt the work towards careful renovation of what already exists.
For a practice housed in an old lakeside village house, the distance is managed with grouped deliveries and a compact schedule. Access for patients with reduced mobility in buildings with thresholds and stairs is dealt with from the study stage.
Services installed according to the chair plans in Céligny
Each chair manufacturer provides a provisions plan. Our partner companies install the supplies, drains, compressed air, suction and electricity exactly at these positions, in the floor or in a partition.
The amalgam separator and the plant room are planned from the outset.
Sterilisation and hygiene
The sterilisation room separates the dirty circuit from the clean circuit, with washable worktops, a water point, sockets and water for the autoclaves.
Floors and walls receive coverings with no open joints.
Reception, waiting and noise
The compressor and suction unit are placed in an insulated room. Treatment rooms receive insulated partitions.
A practice in operation is converted chair by chair.
The items in a dental practice quote in Céligny
- Survey and chair provisions plans
- Water, drainage, compressed air and suction services
- Plant room, compressor and amalgam separator
- Sterilisation room and washable worktops
- Electricity, lighting and IT network with our partners
- Partitions, floors, painting, reception and waiting area
Once the permit is granted, a single point of contact for all the trades
Plumbing installer, electrician, plasterer, floor layer, joiner and painter work with your chair supplier. Entreprise du Bâtiment MS SA engages and manages these trades and keeps the schedule until the equipment is installed.
How a request runs in Céligny
You describe your premises, your activity and the planned work using the form or by phone. After we call you back, a visit is arranged if the project calls for it and we survey the premises.
The quote details each room and each item and presents the options separately. After your written agreement, we settle the schedule and any phases together, in liaison with the building’s property management agency if needed.
Dental practices in the canton All the work in Céligny Water points in Céligny Floors and walls in Céligny Physiotherapy in Céligny Reception and waiting in Céligny Consultation room in Céligny Treatment and sterilisation in Céligny Dental practice in Satigny Dental practice in Vernier Dental practice in Versoix All municipalities
How we work in Céligny
A dental practice needs specific services at each chair. With our partners, we lay water, compressed air, suction, power and data in the floor or the skirting, following the plan supplied by the equipment installer.
The compressor room is insulated against noise, and the sterilisation room is organised from dirty to clean.
Planning a project in Céligny? Entreprise du Bâtiment MS SA, a construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.
Frequently asked questions
Your questions in Céligny
What should be planned under a dental chair in Céligny?
Water, drainage, compressed air, suction, electricity and often the IT network, at the positions specified by the manufacturer.
How long does a dental practice fit-out take in Céligny?
Six to twelve weeks depending on the number of chairs and the condition of the premises, before the equipment is installed. A schedule accompanies the quote and follows your consultation hours and closures.
Is a permit needed to fit out a dental practice in Céligny?
Not for an interior renovation that changes neither the structure, nor the use, nor the layout type of the premises. In that case, neither an architect nor a building permit is needed. If the use or the layout of the premises changes, for example when a partition is moved, or if load-bearing walls are affected, a building permit is required (LCI, Article 1) and we point this out at the visit. The details of the procedure are on the website of the State of Geneva, page apply for a building permit.
Can a chair be added in a practice in operation in Céligny?
Yes, by enclosing the new room, our partners connecting the services during a short closure.
Your project
A dental practice to fit out in Céligny?
Describe the premises, the number of chairs and the planned equipment. Entreprise du Bâtiment MS SA gets back in touch with you to define the scope and price each item.
