Entreprise du Bâtiment MS SA logo, medical practice renovation in GenevaMedical practicesEntreprise du Bâtiment MS SA
Dental practice chair and equipment in Geneva

Satigny, canton of Geneva

Your dental practice fit-out work in Satigny

Your medical practice fit-out company

A dental practice needs precise services under each chair. Entreprise du Bâtiment MS SA coordinates the trades in Satigny based on your supplier’s plans.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA fits out and renovates dental practices in Satigny. Treatment rooms with water, drainage, compressed air, suction and electricity under each chair, a plant room for the compressor and suction motor, a sterilisation room, reception, waiting room and sanitary facilities are carried out by our teams and our partner companies, which we coordinate.

The context in Satigny

The largest municipality in the canton and one of the country’s major winegrowing municipalities, Satigny extends across the heart of the Mandement. Its village, which has a station, is surrounded by winegrowing hamlets, while the industrial zone on the Meyrin side concentrates business activity. Protected rural buildings, villas and business premises thus follow one another from one worksite to the next.

In the industrial zone, a practice benefits from lorry access and open floor plates for partitioning and cabling. In a winegrowing hamlet, the consultation room in an old house is renovated from the inside with deliveries by small vehicles.

Services installed according to the chair plans in Satigny

Each chair manufacturer provides a provisions plan. Our partner companies install the supplies, drains, compressed air, suction and electricity exactly at these positions, in the floor or in a partition.

The amalgam separator and the plant room are planned from the outset.

Sterilisation and hygiene

The sterilisation room separates the dirty circuit from the clean circuit, with washable worktops, a water point, sockets and water for the autoclaves.

Floors and walls receive coverings with no open joints.

Reception, waiting and noise

The compressor and suction unit are placed in an insulated room. Treatment rooms receive insulated partitions.

A practice in operation is converted chair by chair.

The items in a dental practice quote in Satigny

  • Survey and chair provisions plans
  • Water, drainage, compressed air and suction services
  • Plant room, compressor and amalgam separator
  • Sterilisation room and washable worktops
  • Electricity, lighting and IT network with our partners
  • Partitions, floors, painting, reception and waiting area

Once the permit is granted, a single point of contact for all the trades

Plumbing installer, electrician, plasterer, floor layer, joiner and painter work with your chair supplier. Entreprise du Bâtiment MS SA engages and manages these trades and keeps the schedule until the equipment is installed.

How a request runs in Satigny

The detailed quote follows a first discussion about your project and a visit of the premises. The approach is the same for an individual practice and a medical centre. A practice that stays open during the work needs phasing decided before the quote.

Throughout the worksite, a manager answers your questions and each room is checked with you before it is put back into use.

Dental practices in the canton All the work in Satigny Partitions and ceilings in Satigny Water points in Satigny Floors and walls in Satigny Physiotherapy in Satigny Reception and waiting in Satigny Consultation room in Satigny Dental practice in Meyrin Dental practice in Pregny-Chambésy Dental practice in Russin All municipalities

How we work in Satigny

A dental practice needs specific services at each chair. With our partners, we lay water, compressed air, suction, power and data in the floor or the skirting, following the plan supplied by the equipment installer.

The compressor room is insulated against noise, and the sterilisation room is organised from dirty to clean.

Planning a project in Satigny? Entreprise du Bâtiment MS SA, a building company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.

Frequently asked questions

Your questions in Satigny

What should be planned under a dental chair in Satigny?

Water, drainage, compressed air, suction, electricity and often the IT network, at the positions specified by the manufacturer.

How long does a dental practice fit-out take in Satigny?

Six to twelve weeks depending on the number of chairs and the condition of the premises, before the equipment is installed. With the quote, you receive a schedule adapted to your consultations and closures.

Is a permit needed to fit out a dental practice in Satigny?

Not for an interior renovation that changes neither the structure, nor the use, nor the layout type of the premises. In that case, neither an architect nor a building permit is needed. If the use or the layout of the premises changes, for example when a partition is moved, or if load-bearing walls are affected, a building permit is required (LCI, Article 1) and we point this out at the visit. The details of the procedure are on the website of the State of Geneva, page apply for a building permit.

Can a chair be added in a practice in operation in Satigny?

Yes, by enclosing the new room, our partners connecting the services during a short closure.

Your project

A dental practice to fit out in Satigny?

Describe the premises, the number of chairs and the planned equipment. A member of our team calls you back to clarify the scope before drawing up the quote item by item.

Tell us about my project WhatsApp
My project Version française