Entreprise du Bâtiment MS SA logo, medical practice renovation in GenevaMedical practicesEntreprise du Bâtiment MS SA
Wooden worktop and storage

Puplinge, canton of Geneva

Treatment room and sterilisation in Puplinge

Your medical practice fit-out company

A treatment room and a sterilisation room are designed around the flow of equipment. Entreprise du Bâtiment MS SA coordinates the trades in Puplinge.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA fits out the treatment rooms and sterilisation rooms of medical and dental practices in Puplinge. Washable worktops, separation of dirty and clean circuits, water points, supplies for the autoclaves, sockets, ventilation, and floors and walls with no open joints are carried out by the trades we engage and manage.

The context in Puplinge

Next to the urban area in Thônex and the border, Puplinge has kept its village heart while welcoming villa districts and small apartment buildings. The surrounding countryside, crossed by the Seymaz, remains agricultural. Worksites concern both the old houses of the core and more recent buildings.

In a small recent building, a ground-floor consultation room offers a regular structure and level access. In an old village house, you have to work with the existing heights and walls to run the services and install the partitions.

The flow of equipment in Puplinge

The sterilisation room follows the order reception, cleaning, packaging, sterilisation and storage, with no crossover. Worktops are washable and storage is closed.

The water supplies, drain and sockets for the autoclaves are installed by our partner companies at the positions of your appliances.

The treatment room

Hand basin, preparation worktop, storage, shadowless lighting, sockets and trolleys are arranged to limit movement.

Floors and walls are washable and corners are rounded.

Air and cleaning

Air extraction removes heat and steam. Surfaces withstand disinfectants.

The work is done during a short closure or in phases.

The items in a treatment room quote in Puplinge

  • Survey and plan of the circuits
  • Water points, drains and supplies for autoclaves with our partners
  • Washable worktops and storage
  • Electricity, sockets and lighting with our partners
  • Ventilation and extraction
  • Floors, washable walls and finishes

Once the permit is granted, a single point of contact for all the trades

Plumbing installer, electrician, joiner, floor layer, ventilation installer and painter work in the treatment room. Entreprise du Bâtiment MS SA engages and manages these trades based on your appliances’ data sheets.

How a request runs in Puplinge

After a first discussion about your project and a visit of the premises, we draw up a detailed quote. The approach is the same for an individual practice or a medical centre. If the practice has to stay open, the phased organisation is decided before the quote.

During the worksite, a manager can be reached and each room is handed over with you before it is put back into use.

Treatment and sterilisation rooms in the canton All the work in Puplinge Floors and walls in Puplinge Dental practice in Puplinge Physiotherapy in Puplinge Reception and waiting in Puplinge Consultation room in Puplinge Electricity in Puplinge with our partners Treatment and sterilisation in Choulex Treatment and sterilisation in Gy Treatment and sterilisation in Jussy All municipalities

How we work in Puplinge

The treatment room and the sterilisation area follow a circuit that runs from dirty to clean. We fit continuous worktops, full-height washable walls and a floor with welded joints.

Water supplies, drains, sockets and ventilation are sized with our partners for the planned appliances.

Planning a project in Puplinge? Entreprise du Bâtiment MS SA, a construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.

Frequently asked questions

Your questions in Puplinge

What needs to be planned for an autoclave in Puplinge?

A dedicated socket, often a water supply and a drain, a solid worktop and steam extraction, according to the manufacturer’s data sheet.

How long does fitting out a treatment room take in Puplinge?

One to two weeks depending on the services and the worktops. The quote comes with a schedule set around your consultation hours and closures.

Can the circuits be separated in a small room in Puplinge?

Yes, through the order of the worktops and storage, even without a partition, following the direction of the equipment flow.

Which coverings for a treatment room in Puplinge?

Vinyl or linoleum floor with coved skirtings, walls in washable paint or panels, laminate or resin worktops.

Your project

A treatment room to fit out in Puplinge?

Describe the room and your appliances. Entreprise du Bâtiment MS SA gets back to you to clarify the scope and draw up a quote by item.

Tell us about my project WhatsApp
My project Version française