Entreprise du Bâtiment MS SA logo, medical practice renovation in GenevaMedical practicesEntreprise du Bâtiment MS SA
Consultation office with black partitions

Avully, canton of Geneva

Medical practice consultation room in Avully

Your medical practice fit-out company

A consultation room brings together a desk, an examination area and a hand basin in a discreet space. Entreprise du Bâtiment MS SA creates it in Avully room by room.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA fits out and renovates the consultation rooms of medical practices in Avully. Hand basins, closed storage, general and examination lighting, sockets and IT network, insulated partitions and door, washable floors and walls, blinds and radiator covers are carried out by our teams and our partner companies, which we coordinate.

The context in Avully

Avully has the distinctive feature of placing a traditional village next to a group of rental buildings built in a single block, on the plateau of the Champagne genevoise overlooking the Rhône. Vines and crops surround these buildings, where detached houses and rented housing run by property management agencies sit side by side. Work in apartment buildings is arranged around the tenants, while work in the village calls for a craft approach.

In a rental building run by a property management agency, fitting out a practice on the ground floor or an upper floor goes through the agency for the common parts, use of the lift and informing neighbouring tenants before noisy work.

Desk, examination and hand basin in Avully

The room is divided into a consultation area and an examination area, with a hand basin reachable from both. Closed storage keeps equipment out of sight.

A curtain or a screen separates the examination table if the room allows it.

Light and privacy

Shadowless general lighting and an examination lamp are planned, with blinds for privacy and heat. Insulated partitions and door keep conversations from being overheard.

Our partner electrician places the sockets according to your devices.

Surfaces and cleaning

Floors with no open joints, washable paints and wall tiles around the hand basin make daily cleaning easier.

Each room is renovated and put back into use separately.

The items in a consultation room quote in Avully

  • Survey and plan of the room
  • Hand basin, supplies and drain with our partners
  • Partitions, door and sound insulation
  • Lighting, sockets and IT network with our partners
  • Closed storage and casings
  • Floors, washable paint and blinds

Once the permit is granted, a single point of contact for all the trades

Plumbing installer, electrician, plasterer, joiner, floor layer and painter work in the room. Entreprise du Bâtiment MS SA engages and manages these trades and hands over each room in one go.

How a request runs in Avully

After a first discussion about your project and a visit of the premises, we draw up a detailed quote. The approach is the same for an individual practice or a medical centre. If the practice has to stay open, the phased organisation is decided before the quote.

During the worksite, a manager can be reached and each room is handed over with you before it is put back into use.

Consultation rooms in the canton All the work in Avully Ventilation in Avully Painting in Avully Acoustics in Avully Accessibility in Avully Joinery in Avully Practice that stays open in Avully Consultation room in Gy Consultation room in Jussy Consultation room in Laconnex All municipalities

How we work in Avully

The consulting room is organised between the desk, the examination couch and the water point. Our partner electrician places the sockets and data points to suit your furniture and fits adjustable lighting, then we fit an acoustic door.

The walls and floor are chosen for simple daily cleaning.

Planning a project in Avully? Entreprise du Bâtiment MS SA, a building company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.

Frequently asked questions

Your questions in Avully

How long does renovating a consultation room take in Avully?

Three to six days per room depending on the services and finishes. The quote comes with a schedule set around your consultation hours and closures.

Can one room be renovated while the others are in use in Avully?

Yes, the room is closed and sealed off, and the others remain in use.

Is a permit needed to convert a room in Avully?

Not for an interior renovation that changes neither the structure, nor the use, nor the layout type of the premises. In that case, neither an architect nor a building permit is needed. If the use or the layout of the premises changes, for example when a partition is moved, or if load-bearing walls are affected, a building permit is required (LCI, Article 1) and we point this out at the visit. The details of the procedure are on the website of the State of Geneva, page apply for a building permit.

Which lighting for a consultation room in Avully?

Even general lighting, an adjustable examination lamp and blinds to control daylight.

Your project

A consultation room to fit out in Avully?

Describe the room, its use and your equipment. Entreprise du Bâtiment MS SA gets back to you to clarify the scope and draw up a quote by item.

Tell us about my project WhatsApp
My project Version française