Entreprise du Bâtiment MS SA logo, medical practice renovation in GenevaMedical practicesEntreprise du Bâtiment MS SA
Insulated suspended ceiling being installed in premises

Vernier, canton of Geneva

Opening a medical practice in a shell space in Vernier

Your medical practice fit-out company

Opening a practice in a shell space or a former commercial unit brings in every trade. Entreprise du Bâtiment MS SA coordinates the project in Vernier from the plan to the opening.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA fits out new medical practices in Vernier. Based on your plan, we carry out partitions and ceilings, washable floors and walls and painting, our partner companies the water points, sanitary facilities, electricity, IT network, ventilation and reception joinery, then cleaning before the equipment is installed and the practice opens.

The context in Vernier

Between the airport and the bends of the Rhône, Vernier is one of the most populous municipalities in the canton, with emblematic housing estates, including a very long building that everyone knows, villa districts and an old village on the river. Industrial zones and logistics depots complete the picture.

In a large estate, a practice on the ground floor of a building is renovated with the property management agency or the owning foundation for the common parts and informing residents. In an industrial zone, business premises offer wide access and open floor areas to partition.

From the plan to the worksite in Vernier

The practice plan is drawn up by you, your architect or your design office. We price it item by item and prepare the schedule up to the opening.

A change of use of the premises requires a cantonal permit, in the name of the owner or the operator.

All trades coordinated

Partitions, ceilings, water and electrical networks, ventilation, floors, joinery and painting are carried out in a precise order by our teams and our partner companies, which we coordinate.

Once the permit is granted, you have a single point of contact.

Before the opening

Full cleaning, testing of the installations, handover of diagrams and inspection reports, then installation of the equipment by your suppliers.

Small touch-ups are done before the first patients.

The items in a new practice quote in Vernier

  • Survey of the premises and schedule up to the opening
  • Partitions, acoustic ceilings and plastering
  • Water points, sanitary facilities and drains with our partners
  • Electricity, IT network and ventilation with our partners
  • Washable floors and walls
  • Reception joinery, doors and painting
  • Cleaning, tests and handover of documents

Once the permit is granted, a single point of contact for all the trades

A new practice brings eight to ten trades together over a few months. Entreprise du Bâtiment MS SA engages and manages them, keeps the schedule and keeps you informed at each stage.

How a request runs in Vernier

A first discussion and a visit of the premises allow us to draw up a detailed quote. An individual practice and a medical centre follow the same approach. If the practice stays open, we decide on the phases before drawing up the quote.

During the worksite, you can reach a manager and each room is handed over with you before it is put back into use.

Opening a practice in a shell space in the canton All the work in Vernier Doors and blinds in Vernier Medical practice in Vernier Medical centre in Vernier Partitions and ceilings in Vernier Water points in Vernier Floors and walls in Vernier New practice in Versoix New practice in Bellevue New practice in Céligny All municipalities

How we work in Vernier

In premises delivered as a bare shell, we start from the plan approved with the practitioner. We lay the services, screeds and partitions, then the ceilings, water points, floors and paintwork, before the furniture.

The schedule includes the delivery of the medical equipment, so that the practice opens on the agreed date.

Planning a project in Vernier? Entreprise du Bâtiment MS SA, a construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.

Frequently asked questions

Your questions in Vernier

How long does it take to fit out a new practice in Vernier?

Two to four months of work depending on the floor area and the condition of the premises, after any permits have been obtained. The schedule is provided with the quote.

Is a permit needed to open a practice in a commercial unit in Vernier?

If the use of the premises changes, yes. We tell you the technical points and the application remains in the name of the owner or the operator. The authorisation to practise is a matter for you and the health authorities. The details of the procedure are on the website of the State of Geneva, page apply for a building permit.

Can a home be converted into a practice in Vernier?

Changing a home into a business use requires a cantonal permit and is not always possible. We point this out before any quote.

Can you take over a worksite that has already started in Vernier?

Yes, after a review of the work carried out and the remaining points.

Your project

A new practice project in Vernier?

Describe the premises, the number of rooms and the opening date you want. We call you back to pin down the scope of the work, then we draw up a quote by item.

Tell us about my project WhatsApp
My project Version française