Hermance, canton of Geneva

Opening a medical practice in a shell space in Hermance

Your medical practice fit-out company

Opening a practice in a shell space or a former commercial unit brings in every trade. Entreprise du Bâtiment MS SA coordinates the project in Hermance from the plan to the opening.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA fits out new medical practices in Hermance. Based on your plan, we carry out partitions and ceilings, washable floors and walls and painting, our partner companies the water points, sanitary facilities, electricity, IT network, ventilation and reception joinery, then cleaning before the equipment is installed and the practice opens.

The context in Hermance

Hermance closes the Geneva left bank with its medieval town set on the lake, its tower, its harbour and its beach. The strict protection of the old centre closely regulates anything affecting facades, roofs and windows. Outside the old town, villas and the agricultural slope offer more ordinary working conditions.

In the protected old town, a practice fitted out in a medieval house is converted only from the inside, with materials carried by hand from the street. In the surrounding villas, access and parking for a van are much less of a constraint.

From the plan to the worksite in Hermance

The practice plan is drawn up by you, your architect or your design office. We price it item by item and prepare the schedule up to the opening.

A change of use of the premises requires a cantonal permit, in the name of the owner or the operator.

All trades coordinated

Partitions, ceilings, water and electrical networks, ventilation, floors, joinery and painting are carried out in a precise order by our teams and our partner companies, which we coordinate.

Once the permit is granted, you have a single point of contact.

Before the opening

Full cleaning, testing of the installations, handover of diagrams and inspection reports, then installation of the equipment by your suppliers.

Small touch-ups are done before the first patients.

The items in a new practice quote in Hermance

  • Survey of the premises and schedule up to the opening
  • Partitions, acoustic ceilings and plastering
  • Water points, sanitary facilities and drains with our partners
  • Electricity, IT network and ventilation with our partners
  • Washable floors and walls
  • Reception joinery, doors and painting
  • Cleaning, tests and handover of documents

Once the permit is granted, a single point of contact for all the trades

A new practice brings eight to ten trades together over a few months. Entreprise du Bâtiment MS SA engages and manages them, keeps the schedule and keeps you informed at each stage.

How a request runs in Hermance

You describe your premises, the activity carried out and the work you have in mind using the form or by phone. We get back to you, arrange a visit if the project calls for it and survey the premises.

The quote is drawn up room by room and item by item with the options listed separately. After your written agreement, the schedule and any phases are set with you and, if necessary, with the building’s property management agency.

Opening a practice in a shell space in the canton All the work in Hermance Medical practice in Hermance Medical centre in Hermance Partitions and ceilings in Hermance Water points in Hermance Floors and walls in Hermance Dental practice in Hermance New practice in Onex New practice in Perly-Certoux New practice in Plan-les-Ouates All municipalities

How we work in Hermance

In premises delivered as a bare shell, we start from the plan approved with the practitioner. We lay the services, screeds and partitions, then the ceilings, water points, floors and paintwork, before the furniture.

The schedule includes the delivery of the medical equipment, so that the practice opens on the agreed date.

Planning a project in Hermance? Entreprise du Bâtiment MS SA, a construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.

Frequently asked questions

Your questions in Hermance

How long does it take to fit out a new practice in Hermance?

Two to four months of work depending on the floor area and the condition of the premises, after any permits have been obtained. The schedule is provided with the quote.

Is a permit needed to open a practice in a commercial unit in Hermance?

If the use of the premises changes, yes. We tell you the technical points and the application remains in the name of the owner or the operator. The authorisation to practise is a matter for you and the health authorities. The details of the procedure are on the website of the State of Geneva, page apply for a building permit.

Can a home be converted into a practice in Hermance?

Changing a home into a business use requires a cantonal permit and is not always possible. We point this out before any quote.

Can you take over a worksite that has already started in Hermance?

Yes, after a review of the work carried out and the remaining points.

Your project

A new practice project in Hermance?

Describe the premises, the number of rooms and the opening date you want. Entreprise du Bâtiment MS SA gets back to you to clarify the scope and draw up a quote by item.