Entreprise du Bâtiment MS SA logo, medical practice renovation in GenevaMedical practicesEntreprise du Bâtiment MS SA
Building lobby with a staircase with glass balustrade

Choulex, canton of Geneva

Medical practice compliance work in Choulex

Your medical practice fit-out company

A visit from an authority, a change of practice or a practice takeover may call for specific work. Entreprise du Bâtiment MS SA handles the points raised in Choulex.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA carries out compliance work on medical practice premises in Choulex. Points raised during a visit from an authority or the fire service, exits and doors, emergency lighting, detection, access, sanitary facilities, hand basins and ventilation are handled item by item, with the end-of-work documents for your file.

The context in Choulex

Choulex nestles between the residential slopes near the lake and the agricultural plain of the Seymaz. Around the historic core, old houses and farms still in use stand next to villas built on the edges. Large plots and a country atmosphere make access to worksites easy, while respecting the agricultural zone.

With generous plots, a practice worksite in a villa has room to park a van and store materials under cover. The main point is rather adapting a domestic layout to a clear patient route.

Dealing with the points noted in Choulex

Based on the visit report or the list of remarks, we price each point separately and propose an order of execution.

The building work is our responsibility, and the procedures linked to practising your activity remain yours.

Fire safety and exits

Doors and exits, emergency lighting, detection, extinguishers and signage are checked and supplemented with the trades concerned.

The documents handed over at the end are for the practice’s file.

Hygiene, access and premises

Additional hand basins, washable surfaces, an adapted toilet, access without steps and ventilation are the most frequent requests.

We tell you what falls under the work and what falls under the organisation.

The items of a compliance quote in Choulex

  • Reading the report and on-site survey
  • Exits, doors and door closers
  • Emergency lighting, detection and signage with our partners
  • Hand basins, sanitary facilities and washable surfaces with our partners
  • Access and ventilation
  • End-of-work documents for the file

Once the permit is granted, a single point of contact for all the trades

Locksmith, electrician, plumbing installer, plasterer and ventilation installer work according to the points raised. Entreprise du Bâtiment MS SA engages and manages these trades and gives you the useful documents.

How a request runs in Choulex

The detailed quote follows a first discussion about your project and a visit of the premises. The approach is the same for an individual practice and a medical centre. A practice that stays open during the work needs phasing decided before the quote.

Throughout the worksite, a manager answers your questions and each room is checked with you before it is put back into use.

Practice premises compliance in the canton All the work in Choulex Treatment and sterilisation in Choulex Electricity in Choulex with our partners Ventilation in Choulex Painting in Choulex Acoustics in Choulex Accessibility in Choulex Compliance in Gy Compliance in Jussy Compliance in Laconnex All municipalities

How we work in Choulex

We go through the list of requirements sent by the authority or by your architect, point by point. Each item is priced, placed in a schedule and assigned to the relevant trade.

At the end of the work, we give you a file with the data sheets of the materials fitted and the photos.

Planning a project in Choulex? Entreprise du Bâtiment MS SA, a building company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.

Frequently asked questions

Your questions in Choulex

What should be done after a visit from an authority in Choulex?

Send us the report or the list of remarks. We survey the points on site and price each item separately.

How long does compliance work take in Choulex?

From a few days to a few weeks depending on the points raised. With the quote, you receive a schedule adapted to your consultations and closures.

Do you provide the documents for the file in Choulex?

Yes, inspection reports, diagrams and photos of the work carried out are handed over at the end of the worksite.

Do you handle the operating permit in Choulex?

No, it is a matter for you and the health authorities. We provide the specifications and plans of the work if your file requires them. The details of the procedure are on the website of the State of Geneva, page apply for a building permit.

Your project

Compliance points to deal with in Choulex?

Send us the visit report or the list of remarks. A member of our team calls you back to clarify the scope before drawing up the quote item by item.

Tell us about my project WhatsApp
My project Version française