Work in a medical practice that stays open in the city of Geneva
Your medical practice fit-out company
Closing a practice for several weeks is not always possible. Entreprise du Bâtiment MS SA organises the work in Geneva in phases, around consultations.
In brief
Entreprise du Bâtiment MS SA carries out work in medical practices that stay open in Geneva. Room-by-room phasing, a sealed separation between the worksite and the rooms in use, noisy work scheduled outside consultations, protection of circulation areas, daily cleaning and putting each room back into use are organised with the trades we engage and manage.
The context in Geneva
From the Old Town to the Pâquis, Eaux-Vives, Plainpalais, Champel and Servette districts, up to the international organisations district, Geneva occupies both banks of the harbour and the Rhône. Its buildings are dominated by rented residential buildings run by property management agencies, often old and protected. Traffic, parking for machinery and use of public land frame each urban worksite.
Renovating a practice on an upper floor of an old building in the centre means carrying materials or using a goods lift in the stairwell, protecting the common parts, informing neighbours and adjoining practitioners, and a permit to use public land for any skip.
Phasing decided before the quote in Geneva
We define with you the rooms to handle in each phase, the possible hours and the rooms that stay in use.
The quote states the duration and scope of each phase.
Separating the worksite from patients
A sealed separation encloses the work zone, circulation areas are protected and dust is extracted at source.
Noisy work is scheduled early in the morning, in the evening or at weekends.
Back in use every day
At the end of each day, the zone is cleaned and secured. Each finished room is handed over with you before being used again.
A manager can be reached throughout the work.
The items in a quote for work in an open practice in Geneva
- Phasing plan and hours
- Sealed separations and protection
- Work by room according to the phases
- Dust extraction and daily cleaning
- Handover of each room
- Removal of protection and final cleaning
Once the permit is granted, a single point of contact for all the trades
Each trade works within the planned time window, without crossing paths with patients. Entreprise du Bâtiment MS SA engages and manages these companies and keeps the phase schedule with you.
How a request runs in Geneva
A first discussion and a visit of the premises allow us to draw up a detailed quote. An individual practice and a medical centre follow the same approach. If the practice stays open, we decide on the phases before drawing up the quote.
During the worksite, you can reach a manager and each room is handed over with you before it is put back into use.
Work in a practice that stays open in the canton All the work in Geneva Veterinary practice in Geneva Compliance in Geneva Doors and blinds in Geneva Medical practice in Geneva Medical centre in Geneva Partitions and ceilings in Geneva All municipalities
How we work on site
When the practice continues to see patients, we work in short phases. Each zone is isolated by a dust-tight temporary partition, and noisy work is placed outside consulting hours.
Each evening, the zone is cleaned so that patients are received the next day in clean premises.
Planning a project in Geneva? Entreprise du Bâtiment MS SA, a construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.
Frequently asked questions
Your questions in Geneva
Can consultations continue during the work in Geneva?
Yes, in the rooms outside the worksite zone, separated by a sealed partition. Noisy work is scheduled outside consultations.
Does phased work take longer in Geneva?
A little, because each room is handled separately. The schedule provided with the quote shows the duration of each phase.
How do you manage dust and noise in Geneva?
Sealed separation, extraction at source, shifted hours for noise and cleaning every evening.
Should patients be informed in Geneva?
A simple notice at reception is generally enough. We give you the dates of the noisy phases.