Work in a medical practice that stays open in Genthod

Your medical practice fit-out company

Closing a practice for several weeks is not always possible. Entreprise du Bâtiment MS SA organises the work in Genthod in phases, around consultations.

Album of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

Entreprise du Bâtiment MS SA carries out work in medical practices that stay open in Genthod. Room-by-room phasing, a sealed separation between the worksite and the rooms in use, noisy work scheduled outside consultations, protection of circulation areas, daily cleaning and putting each room back into use are organised with the trades we engage and manage.

The context in Genthod

Genthod, between Bellevue and Versoix, slopes down from the old village with its protected buildings to the lakeshore through villa districts. The spacious, wooded properties come with high expectations on execution. The road and railway running along the lake cross the municipality and determine access.

In a wooded property of this type, a consultation room set up on the ground floor or in an annex is renovated while protecting paths and plantings. Crossing the lakeside road and railway sets the delivery slots.

Phasing decided before the quote in Genthod

We define with you the rooms to handle in each phase, the possible hours and the rooms that stay in use.

The quote states the duration and scope of each phase.

Separating the worksite from patients

A sealed separation encloses the work zone, circulation areas are protected and dust is extracted at source.

Noisy work is scheduled early in the morning, in the evening or at weekends.

Back in use every day

At the end of each day, the zone is cleaned and secured. Each finished room is handed over with you before being used again.

A manager can be reached throughout the work.

The items in a quote for work in an open practice in Genthod

  • Phasing plan and hours
  • Sealed separations and protection
  • Work by room according to the phases
  • Dust extraction and daily cleaning
  • Handover of each room
  • Removal of protection and final cleaning

Once the permit is granted, a single point of contact for all the trades

Each trade works within the planned time window, without crossing paths with patients. Entreprise du Bâtiment MS SA engages and manages these companies and keeps the phase schedule with you.

How a request runs in Genthod

Using the form or by phone, you tell us about your premises, your activity and the work you have in mind. We call you back and then, if the project calls for it, come to survey the premises.

You receive a quote room by room and item by item with the options listed separately. Once we receive your written agreement, we set the schedule and any phases with you, with the building’s property management agency if necessary.

Work in a practice that stays open in the canton All the work in Genthod New practice in Genthod Veterinary practice in Genthod Compliance in Genthod Doors and blinds in Genthod Medical practice in Genthod Medical centre in Genthod Practice that stays open in Le Grand-Saconnex Practice that stays open in Meyrin Practice that stays open in Pregny-Chambésy All municipalities

How we work in Genthod

When the practice continues to see patients, we work in short phases. Each zone is isolated by a dust-tight temporary partition, and noisy work is placed outside consulting hours.

Each evening, the zone is cleaned so that patients are received the next day in clean premises.

Planning a project in Genthod? Entreprise du Bâtiment MS SA, a construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.

Frequently asked questions

Your questions in Genthod

Can consultations continue during the work in Genthod?

Yes, in the rooms outside the worksite zone, separated by a sealed partition. Noisy work is scheduled outside consultations.

Does phased work take longer in Genthod?

A little, because each room is handled separately. The schedule provided with the quote shows the duration of each phase.

How do you manage dust and noise in Genthod?

Sealed separation, extraction at source, shifted hours for noise and cleaning every evening.

Should patients be informed in Genthod?

A simple notice at reception is generally enough. We give you the dates of the noisy phases.

Your project

Work without closing the practice in Genthod?

Describe your premises, the rooms concerned and your hours. Entreprise du Bâtiment MS SA gets back to you to propose phasing and draw up a quote by item.

Tell us about my project WhatsApp
My project Version française