Laconnex, canton of Geneva
Dental practice fit-out in Laconnex
Your medical practice fit-out company
A dental practice needs precise services under each chair. Entreprise du Bâtiment MS SA coordinates the trades in Laconnex based on your supplier’s plans.
In brief
Entreprise du Bâtiment MS SA fits out and renovates dental practices in Laconnex. Treatment rooms with water, drainage, compressed air, suction and electricity under each chair, a plant room for the compressor and suction motor, a sterilisation room, reception, waiting room and sanitary facilities are carried out by our teams and our partner companies, which we coordinate.
The context in Laconnex
A small village of the Champagne genevoise, Laconnex is surrounded by crops and borders a nature reserve popular with walkers. The calm and space available make the work simpler, within the limits of the protected agricultural setting.
The calm of a farming village makes it easy to park and unload in front of a house converted into a treatment room. On the other hand, every noisy day can be heard throughout the village and is announced to the neighbours.
Services installed according to the chair plans in Laconnex
Each chair manufacturer provides a provisions plan. Our partner companies install the supplies, drains, compressed air, suction and electricity exactly at these positions, in the floor or in a partition.
The amalgam separator and the plant room are planned from the outset.
Sterilisation and hygiene
The sterilisation room separates the dirty circuit from the clean circuit, with washable worktops, a water point, sockets and water for the autoclaves.
Floors and walls receive coverings with no open joints.
Reception, waiting and noise
The compressor and suction unit are placed in an insulated room. Treatment rooms receive insulated partitions.
A practice in operation is converted chair by chair.
The items in a dental practice quote in Laconnex
- Survey and chair provisions plans
- Water, drainage, compressed air and suction services
- Plant room, compressor and amalgam separator
- Sterilisation room and washable worktops
- Electricity, lighting and IT network with our partners
- Partitions, floors, painting, reception and waiting area
Once the permit is granted, a single point of contact for all the trades
Plumbing installer, electrician, plasterer, floor layer, joiner and painter work with your chair supplier. Entreprise du Bâtiment MS SA engages and manages these trades and keeps the schedule until the equipment is installed.
How a request runs in Laconnex
The detailed quote follows a first discussion about your project and a visit of the premises. The approach is the same for an individual practice and a medical centre. A practice that stays open during the work needs phasing decided before the quote.
Throughout the worksite, a manager answers your questions and each room is checked with you before it is put back into use.
Dental practices in the canton All the work in Laconnex Ventilation in Laconnex Painting in Laconnex Acoustics in Laconnex Accessibility in Laconnex Joinery in Laconnex Practice that stays open in Laconnex Dental practice in Jussy Dental practice in Meinier Dental practice in Presinge All municipalities
How we work in Laconnex
A dental practice needs specific services at each chair. With our partners, we lay water, compressed air, suction, power and data in the floor or the skirting, following the plan supplied by the equipment installer.
The compressor room is insulated against noise, and the sterilisation room is organised from dirty to clean.
Planning a project in Laconnex? Entreprise du Bâtiment MS SA, a construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.
Frequently asked questions
Your questions in Laconnex
What should be planned under a dental chair in Laconnex?
Water, drainage, compressed air, suction, electricity and often the IT network, at the positions specified by the manufacturer.
How long does a dental practice fit-out take in Laconnex?
Six to twelve weeks depending on the number of chairs and the condition of the premises, before the equipment is installed. With the quote, you receive a schedule adapted to your consultations and closures.
Is a permit needed to fit out a dental practice in Laconnex?
Not for an interior renovation that changes neither the structure, nor the use, nor the layout type of the premises. In that case, neither an architect nor a building permit is needed. If the use or the layout of the premises changes, for example when a partition is moved, or if load-bearing walls are affected, a building permit is required (LCI, Article 1) and we point this out at the visit. The details of the procedure are on the website of the State of Geneva, page apply for a building permit.
Can a chair be added in a practice in operation in Laconnex?
Yes, by enclosing the new room, our partners connecting the services during a short closure.
Your project
A dental practice to fit out in Laconnex?
Describe the premises, the number of chairs and the planned equipment. A member of our team calls you back to clarify the scope before drawing up the quote item by item.