Gy, canton of Geneva
Your dental practice fit-out work in Gy
Your medical practice fit-out company
A dental practice needs precise services under each chair. Entreprise du Bâtiment MS SA coordinates the trades in Gy based on your supplier’s plans.
In brief
Entreprise du Bâtiment MS SA fits out and renovates dental practices in Gy. Treatment rooms with water, drainage, compressed air, suction and electricity under each chair, a plant room for the compressor and suction motor, a sterilisation room, reception, waiting room and sanitary facilities are carried out by our teams and our partner companies, which we coordinate.
The context in Gy
Nestled in the east of the canton between Jussy and the border, Gy is one of the smallest Geneva municipalities, surrounded by fields and woods. Its buildings lie almost entirely within the village, with farms, old houses and a few villas. Projects there remain modest in size, focused on the upkeep and conversion of rural buildings.
In such a small village, a treatment room would take its place in an old house or a converted farm. The work then concerns floor levels, openings and services to create in thick walls, with immediate neighbours to consider.
Services installed according to the chair plans in Gy
Each chair manufacturer provides a provisions plan. Our partner companies install the supplies, drains, compressed air, suction and electricity exactly at these positions, in the floor or in a partition.
The amalgam separator and the plant room are planned from the outset.
Sterilisation and hygiene
The sterilisation room separates the dirty circuit from the clean circuit, with washable worktops, a water point, sockets and water for the autoclaves.
Floors and walls receive coverings with no open joints.
Reception, waiting and noise
The compressor and suction unit are placed in an insulated room. Treatment rooms receive insulated partitions.
A practice in operation is converted chair by chair.
The items in a dental practice quote in Gy
- Survey and chair provisions plans
- Water, drainage, compressed air and suction services
- Plant room, compressor and amalgam separator
- Sterilisation room and washable worktops
- Electricity, lighting and IT network with our partners
- Partitions, floors, painting, reception and waiting area
Once the permit is granted, a single point of contact for all the trades
Plumbing installer, electrician, plasterer, floor layer, joiner and painter work with your chair supplier. Entreprise du Bâtiment MS SA engages and manages these trades and keeps the schedule until the equipment is installed.
How a request runs in Gy
Using the form or by phone, you tell us about your premises, your activity and the work you have in mind. We call you back and then, if the project calls for it, come to survey the premises.
You receive a quote room by room and item by item with the options listed separately. Once we receive your written agreement, we set the schedule and any phases with you, with the building’s property management agency if necessary.
Dental practices in the canton All the work in Gy Consultation room in Gy Treatment and sterilisation in Gy Electricity in Gy with our partners Ventilation in Gy Painting in Gy Acoustics in Gy Dental practice in Soral Dental practice in Aire-la-Ville Dental practice in Avully All municipalities
How we work in Gy
A dental practice needs specific services at each chair. With our partners, we lay water, compressed air, suction, power and data in the floor or the skirting, following the plan supplied by the equipment installer.
The compressor room is insulated against noise, and the sterilisation room is organised from dirty to clean.
Planning a project in Gy? Entreprise du Bâtiment MS SA, a construction company in Geneva, carries out this work in houses, villas, apartments and business premises, with a no-obligation quote.
Frequently asked questions
Your questions in Gy
What should be planned under a dental chair in Gy?
Water, drainage, compressed air, suction, electricity and often the IT network, at the positions specified by the manufacturer.
How long does a dental practice fit-out take in Gy?
Six to twelve weeks depending on the number of chairs and the condition of the premises, before the equipment is installed. The quote arrives with a schedule set around your consultation hours and closures.
Is a permit needed to fit out a dental practice in Gy?
Not for an interior renovation that changes neither the structure, nor the use, nor the layout type of the premises. In that case, neither an architect nor a building permit is needed. If the use or the layout of the premises changes, for example when a partition is moved, or if load-bearing walls are affected, a building permit is required (LCI, Article 1) and we point this out at the visit. The details of the procedure are on the website of the State of Geneva, page apply for a building permit.
Can a chair be added in a practice in operation in Gy?
Yes, by enclosing the new room, our partners connecting the services during a short closure.
Your project
A dental practice to fit out in Gy?
Describe the premises, the number of chairs and the planned equipment. We call you back to pin down the scope of the work, then we draw up a quote by item.